Suggestions for Enhancing Renewable Energy Integration in Sri Lanka

pucsl n.w
1 / 4
Embed
Share

Explore suggestions for improving the integration of renewable energy in Sri Lanka, including timelines for grid concurrence letters, joint inspections, cost estimates, documentation uniformity, and more.

  • Renewable Energy
  • Sri Lanka
  • Grid Integration
  • Sustainability
  • Energy Sector

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. PUCSL Public Consultation Suggestions by Regen Renewables (Pvt.) Ltd

  2. Commercial & Industrial Sector Consumers Net Plus Schemes Definite timeline for issuing of Grid Concurrence Letters from CEB Preliminary joint inspections by integrator & utility to identify scope of utility activities Advice customer of any civil constructions or modifications necessary with relevant drawings

  3. Commercial & Industrial Sector Consumers Net Plus Schemes Contd .. Provide cost estimate and accept payments for utility scope of work within the erection period CEB/LECO to proactively have material procured/allocated to carry out utility scope of work upon completion of the installation Acceptable timeline for testing for Harmonics & performance

  4. Domestic Sector Consumers - Net Metering & Net Accounting Schemes Uniformity of documentation & procedures across all regions of CEB & LECO Allow higher capacity inverters be installed for future capacity increase