Sustainable Energy Technology Project Review Insights
Explore a comprehensive overview of a sustainable energy project review, covering funding, technology background, project scope, progress updates, and more. Gain valuable insights into the innovative solutions and advancements in energy technology development.
Download Presentation
Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
General Guidance (Not to be included in the presentation) Please refer to the agenda to confirm your presentation time and duration. Do not include business sensitive, proprietary, and/or Unclassified Controlled Information in your presentation. Please allow three (3) minutes of your allotted presentation duration for questions and answers. 1
Project Title Project Number Presenter s Name Organization/Company U.S. Department of Energy National Energy Technology Laboratory Resource Sustainability Project Review Meeting April 2-4, 2024
Project Overview (1-2 Slides) Funding (DOE and Cost Share) Overall Project Performance Dates Project Participants Overall Project Objectives 3
Technology Background (2-3 Slides) Use the guidance from this slide, as applicable, to your project and technology a. Describe how the technology is envisioned to work in operation, including a simple schematic labeled with preferred operating conditions (e.g., pressures and temperatures), and any other requirements b. Describe fundamental science driving technology (chemistry, thermodynamics, etc.) c. Discuss technology development efforts prior to current project (e.g., previous lab and/or bench-scale testing) d. List and briefly describe the technical and/or economic advantages of your technology. e. List and briefly describe the technical and economic challenges of your technology. f. If applicable, Technology/Site Selection Describe the rational or approach to site selection just the major factors that controlled the decisions. Briefly outline the site characterization efforts 4
Technical Approach/Project Scope (1-2 Slides) a. Experimental design or project steps and work plan b.Project schedule just provide key milestones; do not include a detailed Gantt chart c. Project success criteria d.Project risks and mitigation strategies 5
Progress and Current Status of Project (6-10 Slides) This should be the focus of the presentation. If applicable, please emphasize accomplishments since last year s meeting. a. As appropriate, description of the equipment used/built in the project b. Significant accomplishments and how they tie to the technology challenges c. Performance levels achieved so far when compared to project goals and how the performance relates to the economic and technical advantages d. Identify synergy opportunities; discuss how collaboration could have a synergistic effect on advancing the technologies described during the session. 6
Plans for future testing/development/ commercialization (1-2 Slides) Plans for future testing/development/commercialization (one or two slides) a. In this project b. After this project (i.e., next project) c. Scale-up potential, if applicable 7
Outreach and Workforce Development Efforts or Achievements (If Applicable) Outreach - Provide a bulleted list of community outreach efforts or achievements. Workforce Development Provide a bulleted list of ways you have developed the current or future workforce including training/graduating students or postdocs, (re-)training tradespeople or professionals, etc. 8
Summary Slide a. Discuss your key findings, lessons learned, and future plans. b. Provide your take-away message. 9
Appendix These slides will not be discussed during the presentation but are mandatory. 10
Organization Chart Describe project team, organization, and participants. Link organizations, if more than one, to general project efforts (i.e., materials development, design, systems analysis, pilot unit operation, management, risk/cost analysis, etc.). Please limit company specific information to that relevant to achieving project goals and objectives. 11
Gantt Chart Provide a simple Gantt chart showing project lifetime in years on the horizontal axis and major tasks along the vertical axis. Use symbols to indicate major and minor milestones. Use shaded lines or the like to indicate duration of each task and the amount of work completed to date. 12