System Integration and Test Review (SITR) Agenda and Updates

app system integration test review sitr april n.w
1 / 23
Embed
Share

"Explore the comprehensive agenda and updates for the System Integration and Test Review (SITR) on April 8, 2014. The review covers hardware and software departures from the design, status responses, testing readiness, and more critical aspects of the integration plan."

  • System Integration
  • Test Review
  • SITR
  • Hardware
  • Software

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. APP System Integration & Test Review (SITR) April 8, 2014 Agenda & Introductory Material

  2. SITR SITR agenda: Status Response to assigned CDR RIDs Departures of delivered hardware and software from the design presented at CDR Post-CDR updates to this Integration and Test Plan and other critical documents Waivers, non-conformances, and changes to requirements Integration Plan Status: What was delivered (MEL)? Any discrepancies? ICD compliance Status of connectors and structures (cables, racks, cooling, grounding ) Test hardware Assembly procedures, including first application of power Disassembly, shipping and reassembly Anything else to be done prior to the PAI sequence Open issues and concerns Test Readiness Workshop (Tuesday p.m.) Work on reconciling procedures with full requirements matrix in I&T Plan

  3. APP SITR HARDWARE STATUS

  4. Response to CDR RIDs 2 unresolved 12 resolved but not close 42 closed RID? # Description Reporter Baudry Status 43 Define? fallback? position? in? CSV? Plan Detailed? &? costed? maintenance? plan? w/? each? hardware? delivery 4 Verification? Matrix 10 I&T? Plan? clarification 17 CSV? revision? number 35 Response? to? power? outage 40 I&T? Plan? improvements 41 CSV? with? APEX Unresolved 47 Whyborn Miccolis Lopez Pauwels Whyborn Lopez Webber Unresolved Resolved Resolved Resolved Resolved Resolved Resolved 42 I&T? Plan? details 48 Resource-loaded? schedule 49 Schedule? &? budget? contingency 54 I&T? Plan? upgrade 55 Hardware/Software? Interaction? 56 Telcal? concerns Corder Ocampo Ocampo Pauwels Pauwels Kobayashi Resolved Resolved Resolved Resolved Resolved Resolved

  5. Departures from CDR design Delivered Hardware ROACH cards are configured on ALMA network, not on private network as proposed. Network switch and NIC were provided in case ALMA prefers to isolate them. Discrete 1 pps distributer implemented as final adder card (new Xilinx code). Maser rack design modified to incorporate a pair of standard seismic racks. Remote access added to maser.

  6. Departures from CDR design Software (summary) Minor tactical changes only, including updated feature list

  7. Post-CDR updates to documentation Updates to existing documents Integration & Test Plan V2.1 (changes) Hardware ICDs New Documents or summaries SITR plan Assembly procedures Summary of Engineering Change Requests (deviations from ICD or requirements) Problem and Failure summary report Non-conformance records

  8. SITR Plan See document

  9. Assembly procedures Maser power-up sequences (see maser I&T plan). This should be at a level of detail appropriate for high altitude operation. Pictures sent to support installation of PICs, power supplies, etc. Need to power down, insert cables, plug in, install boards. Test fixture procedures are same as have been followed during development. Some of this information will be captured in the maintenance plan. Some captured in PAI procedures. ESD protocols, etc.

  10. Engineering Change Requests since CDR No requirements changes since revised I&T plan submitted Need to check on specifications such as set-up time between scans (slower than expected) B version of computing ICDs Between ALMA Phasing Project And ALMA Computing (ALMA-05.11.00.49-0004-B-ICD) Between C167 Microprocessor And ROACH2 FPGA (internal ICD, ALMA-05.11.10.49-0005-B- ICD)

  11. Problem and failure reports (since CDR) Minor problem with DTS test fixture Solution: Operating system with 2 input channels instead of 3 Shorted pins in two connectors on the PIC. Solution: Move all of the signal vias so they fan-out on the outside edge of the pins instead of under the connector "Tent" all of the remaining vias under the connectors with solder mask to minimize the risk of shorts The assembler has taken steps to reduce the amount of solder used so it will also reduce the potential for bridging Cause: Workmanship 4 of 12 SFP+ cards failed incoming inspection. Solution: Failed boards replaced Cause: Unclear. 1 PPS maser signal failure after remote upgrade Solution: Reset on network card Mitigation: Document in maintenance plan Impact: Low (does not affect operation) Various software bugs fixed Unresolved issue in y-y polarization sum (firmware in LTA?). Note that x-x sum works fine.

  12. Nonconformances and waivers No nonconformances No waivers

  13. APP SITR INTEGRATION PLAN

  14. H/N ICT-310 N ICT-315 N ICT-317 N ICT-726 H/N ICT-966 VOM? InterferometryController LTA? protocols? for? antenna? sum TFB? commands? to? support? phasing Retrieve? and? apply? TelCal? VOM:? VLBI? ? interfaces S/W and CSV Flow 9/20/13 12/25/13 ALMA Release 10.4 Key Haystack Delivered NRAO H H Device:? Hydrogen? Maser Device:? VLBI? OFL VOM:? PhasingController VOM:? Control? of? Antenna? CAI-63 VOM:? DataCapturer? support TelCal:? Simple? Phase? Solver? CDP? support? for? slow? phasing? loop ObservationControl? interface ICT-1994 Adding? CalAppPhase? ? to? ASDM? ICT-2162 APP? CAN? commands ICT-2177 setAppPhaseParameters ICT-2293 NodeImpl::startSubscanSequence ICT-2310 TFB? phase? adjustments? reset ICT-2311 APP? phase? corrections ICT-301 ICT-302 Scheduled MPIfR H/N ICT-311 N ICT-313 N ICT-314 M ICT-321 N ICT-854 N ICT-967 Other Provisional 12/23/13 2/12/14 ALMA Release 10.6 CSV 0A: Loop closure 1/25/14 Phase IV support 1/15/14 1/29/14 CSV 0E: Maser test 5/19/14 H Device:? VLBI? Recorder VOM:? VLBIController PIC? control TelCal:? Phase? Solver? (Advanced) ICT-2435 Refine? quality? calculation ICT-2436 Calculate? efficiencies ICT-2305 TelCal? Solver? Antenna? Index? Error? ICT-2306 TelCal? Solver? zero? phase? ? ICT-2317 TelCal? adjust? time ICT-324 TelCal:? Efficiency? Monitor ICT-326 VEX? to? XML ICT-965 QuickLook? for? CalAppPhase ICT-1003 PIC? diagnostics? interface ICT-1353 Antenna? flags? in? DataCapturer ICT-1356 Expand? CAN? message? queues ICT-2294 CDP? support? for? antenna? sum ICT-2295 VOM:? Advanced? PhasingController ICT-2329 Preserve? array? after? using? VOM ICT-2446 Device:? Hydrogen? Maser? ICT-2449 cdp? disable? residual? delay? ICT-303 Not available for validation H/N ICT-312 N ICT-316 M ICT-323 3/31/14 4/30/14 ALMA Release 10.8 CSV 0B: Commensal cal. 5/1/14 - 8/5/14 Verification support April 2014 H/W Acc. Rev. 7/21/14 H N N N N 6/13/14 7/11/14 CSV 0D-1C: ALMA Tests 8/5/14 - 8/12/14 ALMA Release 2014.2 Verification support July 1-11, 2014 M H H H N H/N ICT-319 H ICT-325 ICT-2296 Access? to? Array? Status? GUI ICT-305 ICT-304 ICT-307 ICT-306 ICT-318 GUI:? TelCal? Results? Display GUI:? VLBI? Hardware? Status? Panel GUI:? VLBI? Observation? Status GUI:? CCC? phase? updates Phase? update? query? interface Phase? updates? for? fast? loop VLBI? Scripts? (VEX2VOM? v1.0) Not available for validation 9/15/14 10/24/14 CSV 1D-1F: Local VLBI 1/7/15 ALMA Release 2014.4 Verification support September 2014 CSV 2B: Band 6 CSV 4/1/15 H ICT-327 ICT-1455 Upgrade? antlr? version ICT-1734 APP? Device? Alarms VEX2VOM? Tool? V2.0 12/15/14(?) ALMA Release 2014.6 DiFX & Post-processing H

  15. I&T Flow NRAO LTA Protocols PIC protocols SCC Protocols FPGA personalities ALMA Key ALMA CVS Repository Software Hardware NRAO PICAs I&T NAOJ Fiber Multiplexors Integration & Test (NRAO, Team) NRAO 4/8/14 Integration (Haystack) PAI 1 of 5, +OFL NRAO Charlottesville Haystack ASIAA SITR Recording system Recorder media 5/15/14 2+2 of 5 ASIAA Mark 6 Recorders 6/7/14 Component Test (U. Conc., Team/JAO) ALMA NRAO PAS Integration (Haystack, U. Conc.) OSF (Chile) Maser rack 6/16/14 TRR Haystack Maser system Haystack 7/4/14 Maser Hardware complete System Test (U. Conc., Team/JAO) ALMA AcRv Haystack AOS (Chile) GUIs TRR 7/21/14 VEX to VOM Device control PIC Control VLBI Observing Mode Post-Observation S/W Subsystem Test (NRAO) ALMA ALMA SVN Repository 8/1/14 Commissioning (U. Conc., Team/JAO) ALMA MPIfR Polarization cal Telcal phase solver AOS (Chile)

  16. What was delivered? 2 recorders at OSF currently, one at NRAO. Two more will be shipped from Haystack to OSF when development is complete at Haystack, but may not be in time for PAS. OFL delivered to NRAO Maser to be shipped to OSF (est. May 10).

  17. ICD Compliance See ICDs

  18. Connectors and structures Cables, racks, cooling, grounding, etc. Cables Either in place or about to ship Maser? Check with Shep. Cooling: Unknown, need to measure PICA FGPA and PowerPC in AcRv sequence. Maintenance plan for Mark 6 should describe cooling issue with upgraded mother board. Measure OFL box at AOS? Maser should be ok, same as APEX. Battery life? Racks Maser rack structurally complete, requires grounding plan as part of maser PAI/PAS. Rails for recorders shipped

  19. Test hardware Need to identify 2-antenna correlator (Bulletproof not available). Two in technical Facility Building (TFSD preferred, TFInt is option). Otherwise just routine lab equipment (scope, hand-tools).

  20. Assembly procedures (Will walk through lab)

  21. Disassembly, shipping, reassembly Piecemeal approach Component-level testing on install following ALMA protocols (regression testing) Maser shipped under battery power, needs to be delivered within TBD hours. See maser I&T plan. See Transportation Plan for crating. Revise transportation plan for maser. Shock sensors, etc., as needed.

  22. Open issues & concerns

  23. New documents for TRR (from plan) Memorandum of Agreement (Shep) Subsystem specifications / design documentation (TBD) Compliance matrix (Joe) Test procedures (TBD) Assembly procedures (TBD) Training plan (TBD) Initial operator and software group training (complete) Opportunity training during missions User manuals (end-of-project) Training briefing (materials only) Internal ALMA expertise (Alejandro) Summary of Engineering Change Requests (Mike) Summary of Problem and Failure Reports (Mike) Non-conformance records (Bob?)