Transportation Infrastructure Development Challenges and DPWH Insights in Cebu City

Download Presenatation
republic of the philippines department of public n.w
1 / 7
Embed
Share

Explore the gaps and challenges in transportation infrastructure development at the regional level, with a focus on Road-Right-of-Way issues and the need for improved project implementation in Cebu City. Gain insights from the DPWH on addressing these challenges in the context of the Build-Build-Build policy.

  • Transportation
  • Infrastructure
  • DPWH
  • Cebu City
  • Development Challenges

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Republic of the Philippines Department of Public Works and Highways Regional Office VII South Road Properties, Cebu City 26th Annual Conference Transportation Science Society of the Philippines (TSSP) Date: 26 July 2019 Date: 26 July 2019 Venue: University of San Jose Venue: University of San Jose Recoletos, Cebu City Recoletos, Cebu City DPWH Inputs on Transportation Infrastructure DPWH Inputs on Transportation Infrastructure Development Gaps highlighting efforts relative to the Development Gaps highlighting efforts relative to the Government s Build Government s Build- -Build Build- -Build policy in the context Build policy in the context of addressing current Challenges of addressing current Challenges EDGAR B. TABACON, CESO IV EDGAR B. TABACON, CESO IV Regional Director, DPWH-7

  2. DPWH Inputs: Panel Discussion of DPWH Inputs: Panel Discussion of the 26th TSSP Annual Conference the 26th TSSP Annual Conference Republic of the Philippines Department of Public Works and Highways Regional Office VII South Road Properties, Cebu City Guide Questions: 1.What transportation infrastructure development at the regional level? are the gaps/challenges in the 2. What is your perspective on the government s Build-Build-Build policy in the context of addressing the gaps?

  3. DPWH Inputs: Panel Discussion of DPWH Inputs: Panel Discussion of the 26th TSSP Annual Conference the 26th TSSP Annual Conference Republic of the Philippines Department of Public Works and Highways Regional Office VII South Road Properties, Cebu City Gaps/challenges in the transportation infrastructure development at the regional level: Road-Right-of-Way (RROW) Issues Tedious process in the acquisition of properties affected by DPWH projects. (this includes approval/clearance in mangrove areas) Removal/Transfer of Existing Utilities Affected. Insufficient contractors that could implement infrastructure projects on time, vis- -vis, the growing number of projects The need to establish a Regional or Field Office for the Department of Transportation (DOTr) in this region.

  4. DPWH Inputs: Panel Discussion of DPWH Inputs: Panel Discussion of the 26th TSSP Annual Conference the 26th TSSP Annual Conference Republic of the Philippines Department of Public Works and Highways Regional Office VII South Road Properties, Cebu City DPWH 7 perspective on the Government s Build-Build-Build policy in the context of addressing the gaps/challenges: Road-Right-of-Way (RROW) Issues Provision of funds to undertake in advance the Detailed Engineering Design (DED) activities to pave the way for the early conduct of parcellary and appraisal so that properties/public utilities affected and clearances/permits shall be acquired first prior to construction activities instead of lumping it with the civil works funds and carrying out simultaneously during construction.

  5. DPWH Inputs: Panel Discussion of DPWH Inputs: Panel Discussion of the 26th TSSP Annual Conference the 26th TSSP Annual Conference DPWH 7 perspective on the government s Build-Build-Build policy in the context of addressing the gaps/challenges: Republic of the Philippines Department of Public Works and Highways Regional Office VII South Road Properties, Cebu City Insufficiency in the number of contractors that could implement infrastructure projects on time, vis- -vis, the growing number of projects 1. Encourage well-performing small time contractors to upgrade their level of contracting category to augment the workforce of the current construction industries comprised of moderate to large-scale private contractors which are undertaking government infrastructure projects. 2. The implementation of the new policy of the government on Cash-Based Budgeting, which has only one year implementation period will significantly address this concern. It is expected that more contractors will be involved in the construction of DPWH projects because of stringent measures imposed on the project duration within a one (1) year period giving the chance and encouraging other contractors to participate.

  6. DPWH Inputs: Panel Discussion of DPWH Inputs: Panel Discussion of the 26th TSSP Annual Conference the 26th TSSP Annual Conference Republic of the Philippines Department of Public Works and Highways Regional Office VII South Road Properties, Cebu City DPWH 7 perspective on the government s Build-Build-Build policy in the context of addressing the gaps/challenges: The need to establish a Regional or Field Office for the Department of Transportation (DOTr) in this region. In highly urbanized and overly crowded centers like Metro Cebu, the necessity to have a mass transport facilities has become an urgent demand in order to address the worsening traffic congestion. Given the seriousness of the present situation wherein Metro Cebu is losing P3.1 Billion pesos a day due to traffic congestion according to JICA Study, DOTr should have a Regional or Field Office in Region 7 which will focus in the formulation and pursuance of mass transport that will effectively complement the growing infrastructure developments in Metropolitan Cebu and the whole region as well.

  7. DPWH Inputs: Panel Discussion of DPWH Inputs: Panel Discussion of the 26th TSSP Annual Conference the 26th TSSP Annual Conference Republic of the Philippines Department of Public Works and Highways Regional Office VII South Road Properties, Cebu City A dream doesn t become reality through magic; it takes A dream doesn t become reality through magic; it takes sweat, determination and hard work sweat, determination and hard work. . Colin Colin Powell Powell Thank You! Thank You!

Related


More Related Content