In the TURKSAT Model Satellite Competition 2024 Preliminary Design Review, teams present their descent rate calculations, mechanical subsystem overview, filtering module design, CDH overview, ICN configuration, and a bonus mission involving IoT data transfer. The presentation includes detailed explanations, diagrams, and specifications for various components of the model satellite. Teams showcase their technical expertise and problem-solving skills in designing a functional satellite model for the competition.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
<University Name> TURKSAT Model Satellite Competition 2024 Preliminary Design Review (PDR) Presentation Version 2.1 <Your Team #> Your Team Name Here
Descent Rate Calculations Team Logo Here Present descent rate calculations for the following Model Satellite configurations; Model Satellite (Container + Science Payload) rate before seperation, Container rate following separation from the Science Payload, Science Payload rate following separation from the Container. Indicate assumptions in calculations with their reasons. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 2
Mechanical Subsystem Overview Team Logo Here Container, Science Payload, separation mechanism design drawings and sizes, The working principle of the separation mechanism of the Container and the Science Payload should be explained. NOTE: The separation demonstrated using clearly visuals from different angles. mechanism should be TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 3
Mechanical Filtering Module Team Logo Here Mechanical drawings and dimensions must be specified. The working principle of the Mechanical Filtering Module should be explained. The materials to be used in the filtering module (plexiglass, PVC, etc.) should be specified. It should be explained how to perform filter coloring. The example of the telecommand to be sent from the interface and the image expected after this command should be shown and interpreted. (Must be an example specified by the team.) Filtering Module mechanism design TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 4
CDH Overview Team Logo Here Communication electronic components and communication module shall be indicated on the diagram. protocols of the sensors, other TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 5
ICN (Inter-System Communication Network) Team Logo Here The phases of the data transfer from the Container to the Science Payload, from the Science Payload to the Ground Station should be shown with a flow diagram. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 6
Bonus Mission (IoT Data Transfer) Team Logo Here A flow diagram of the transfer stages of sensor data connected to the ground station computer via cable to the science payload and from the science payload to the ground station should be shown. The module/antenna type and operating frequencies to be used must be specified. The type of sensor to be used and the reason for choosing it should be specified. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 7
FSW State Diagram Team Logo Here Flight Software Diagram; includes the states and cycles of the Model Satellite during flight: Communication (commands, telemetry data, video transfer, IoT data transfer, etc.), Mechanism activations (separation, ICN and mechanical filtering algorithm etc.), telecommand, TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 8
GCS Software Team Logo Here Display prototypes showing how to user interface will be in detail. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 9
Interface Alarm System (IAS) Team Logo Here It should be examined how the input data specified in the Interface Alarm System will generate output with a loop in the processor. The system monitoring mechanism should be evaluated. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 10
Subsystem Level Testing Plan Team Logo Here The plans of the tests to be applied to each subsystem shall be specified: Plan of tests to be applied to the sensor subsystem step by step, Plan of tests to be applied to the CDH subsystem step by step, Plan of tests to be applied to the EPS subsystem step by step, Plan of tests to be applied to the FSW subsystem step by step, Plan of tests to be applied step to the Mechanical subsystem step by step, Plan of tests to be applied to the Descent Control System step by step. NOTE: We recommend that you do not delay this planning, discuss this planning repeatedly at certain stages of your work, and develop / update your diagram. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 11
Environmental Test Plan Team Logo Here Specify plans for environmental testing: Drop Test, testing processes Thermal Test, testing processes Vibration Test, testing processes NOTE: We recommend that you do not delay this planning, discuss this planning repeatedly at certain stages of your work, and develop / update your diagram. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 12
Conclusions Team Logo Here Include report summary and conclusions. NOTE: In general include the following: Completed work, Unfinished work, At which stage of the plan. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 13
Team Logo Here Presentation Scoring & Additional Information The following slides are about presentation scoring. Do not include the following slides and this slide in the your presentation. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 14
Presentation Format Team Logo Here The content of the presentation should be prepared within the scope of the subjects mentioned above. Presentation format and originality should be prepared according to the request of the team. The presentation time is 20 minutes and the question will be answered within 5 minutes after the presentation. The presentation should be completed without exceeding this time. TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 15
Evaluation Criteria Team Logo Here The quality of the presentation is scored. Scoring criterias: Understandable Laconic Teleconference performance Mastery of the subject Content TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 16
Team Logo Here PPT Template Use Team logos: Team logo view slide master (logo is added to the top left corner of the top template) close master view Each team shall add team name and number to the template. View slide master (make necessary arrangement in the relevant part of the top template) close master view On each slide, replace the Name here in the bottom left corner with the name of the person(s) presenting that slide This will allow the judges to know the person to address any questions or comments to 1 2 3 4 5 TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 17
Team Logo Here Create an Additional Slide You can use extra slides; A slide including a different heading will not be created! The same slide heading will be created in the additional slide according to the following example. For example; Model Satellite Integration and Test Overview has 6 slides The slide headings will look like this; Model Satellite Integration and Test Overview (1/6) Model Satellite Integration and Test Overview (2/6) Model Satellite Integration and Test Overview (6/6) . . . TURKSAT Model Satellite Competition 2024 PDR: <Team Name> Team Number: ##### 18