
Unpacking Victorian Curriculum: Design and Technologies
Victorian Curriculum for Design and Technologies offers a comprehensive framework for schools to implement a curriculum starting from 2017. It includes learning areas, capabilities, timelines, terminology, components, and the structure of the curriculum. The document outlines band descriptions, content descriptions, achievement standards, and provides guidance for students across different levels. Schools have the flexibility to initiate implementation as early as desired, with full adoption expected by 2017.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
CARE AUSTRALIA CARE AUSTRALIA PROGRAM QUALITY FRAMEWORK PROGRAM QUALITY FRAMEWORK The PQF looks at three stages of the project cycle: concept/proposal/design; inception/implementation/monitoring; and review/evaluation. For each stage, it sets out key consultation and programming processes for Australian- funded projects; proposed mandatory steps; tools and guidance (noting where these are existing or planned), and proposed roles within CARE Australia and the CO. The following slides provide an overview of the PQF, with flowcharts summarising programming processes, key program quality steps, and relevant outputs at each stage. For full detail on roles and processes, please refer to the full PQ Framework and associated documents. If you have any queries or suggestions, please check with CARE Australia s Quality and Impact team (QI).
CA PQ FRAMEWORK CA PQ FRAMEWORK overview of concept/proposal/design stage overview of concept/proposal/design stage JOINT PLANNING AGREEING TOR DESIGN FORMAT APPRAISAL AND PEER REVIEW FINAL SIGNOFF DESIGN REVIEW A joint plan for design process is agreed between CO and CP, to set out key steps, inputs, scheduling. If using consultants, TOR are to be cleared and signed off by CO in consultation with CP before proceeding to recruit. CA arranges appraisal of draft design and peer review with CO; feedback is then consolidated and followup agreed with CO. If not using specific donor format, the design will be based on an agreed CA format. Following finalisation of design by CO/CA, PCIM reviews and signs off budget; PE IP approves final design to submit to donor. Brief design review concall identifies any outstanding quality or process issues and any followup needed by CA/CO. Agreed design format Agreed design plan Approved final design Design review writeup Agreed TOR Appraisal comment
CA PQ FRAMEWORK CA PQ FRAMEWORK overview of inception/implementation stage overview of inception/implementation stage STAFF INCEPTION PROCESSES SETTING BASELINE ANNUAL REVIEW/ REFLECTION PROJECT REPORTS AND PLANS ONGOING MONITORING RECRUITMENT CO recruits and briefs staff, with CA providing necessary info on Australian requirem ts. CO conducts inception workshop or process for staff and stakeholders; CA attends or provides inputs. Within Annual Planning, CO leads brief Review and Learning process, documented (by CA if in attendance) for annual reporting. CO develops TOR for baseline for consultation with CA, signoff by ACD-P; CA reviews draft baseline report, CO finalises. Reports and annual plans for donor provided by CO, reviewed / cleared by CA (including financials) , signed off by PE and sent to donor. CO oversees M&E of implement n, expenditure; CA monitors including through PSMVs which provide basis for agreed followup. Baseline TOR and report Brief review document Project reports, annl plans Induction complete Inception complete PSMV reports
CA PQ FRAMEWORK CA PQ FRAMEWORK overview of review/ evaluation stage overview of review/ evaluation stage JOINT PLANNING AGREEING TOR EVALUATION PLANNING / IMPLEMENT N REVIEW AND FEEDBACK FINAL SIGNOFF & MANAGEMENT RESPONSE DISSEMINAT N & REPORTING A joint plan for evaluation process is agreed between CO and CA, to set out key steps, inputs, scheduling, roles. If using consultants, TOR are to be developed by CO with review from CA and signed off by ACD-P before proceeding to recruit. Draft report from CO is reviewed by CA and consolidated feedback provided for followup by CO and consultants. CO oversees eval plan, methodol gy, field research and in- country consultations with support from CA as agreed. Following finalisation of report by CO/ CA,PE IP approves final report to submit to donor. CO prepares brief management response. CA lodges final report on CI Online library and summary on CA website; includes summary in annual reporting on evaluations undertaken. Agreed evaluat n plan Docu- mented feedback Approved final report Eval report online Agreed joint plan Agreed TOR