Upcoming Road Improvement Project in Town of Grand Chute, WI

n mayflower drive reclaim and pave town of grand n.w
1 / 10
Embed
Share

Get all the details about the upcoming road improvement project on N. Mayflower Drive in the Town of Grand Chute, WI. Learn about the project background, timeline, impacts on residents and businesses, and more. Stay informed and prepared for the construction work starting in August 2025.

  • Town of Grand Chute
  • Road Improvement
  • Construction Project
  • Wisconsin
  • N. Mayflower Drive

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. N Mayflower Drive Reclaim and Pave Town of Grand Chute, WI Public Information Meeting June 12, 2025

  2. Introductions Town of Grand Chute Jordan Jolma, PE Director of Public Works Josh Braun, PE Deputy Director of Public Works: Engineering Ayres Trace Hubbard, PE Project Manager Matt Looby, PE Project Engineer MCC, Inc. Ian Murphy Project Manager Ingenuity, Integrity, and Intelligence.

  3. Project Location N Mayflower Drive (W Grande Market Drive to Schroth Lane) Ingenuity, Integrity, and Intelligence.

  4. Project Background Roadway widening, asphalt resurfacing, pavement marking Intersection Improvements Adding dedicated left turn lanes at the intersection of Mayflower Dr and STH 96 Installation of underground conduit for future WisDOT traffic signal installation Drainage improvements Replacement of cross-culverts and deficient driveway culverts Spot grading roadway ditches Town received Local Road Improvement Program (LRIP) funding for project No special assessments or project costs will be charged to landowners. Ingenuity, Integrity, and Intelligence.

  5. Mayflower Drive and STH 96- Section Ingenuity, Integrity, and Intelligence.

  6. Project Timeline Work on N Mayflower Drive is anticipated to begin August 2025. Construction is anticipated to be completed by October 1, 2025. Ingenuity, Integrity, and Intelligence.

  7. Impacts to Residents and Businesses Driveway access during culvert replacement and paving Contractor will notify resident prior to restricting driveway access. Asphalt driveway and culvert replacement will be completed during the day and access will be restored by the end of the working day. Traffic Detour Detour will be posted to alert motorists of the road closure Planned 28-day closure on Mayflower Drive north and south of STH 96 for concrete pavement construction, culvert replacement, roadway widening Contractor will accommodate access for garbage trucks and mail delivery Ingenuity, Integrity, and Intelligence.

  8. Road Closure/Detour Ingenuity, Integrity, and Intelligence.

  9. Project Safety Reduce Travel Speed - Please lower your speed while driving within the project limits to maintain the safety of the workers. Maintain Distance from Equipment - Operators have limited visibility from equipment. Make sure that you keep a safe distance from equipment. Avoid Active Work Areas - If you can avoid an active work area, please do so to maintain safety of the workers and progress of the project. Do Not Tamper with Staking/Locating - Staking is critical items are installed correctly, please do not alter or remove stakes or utility locating flags. Ingenuity, Integrity, and Intelligence.

  10. Questions Please send project specific questions about the project to: Josh Braun, P.E. Deputy Director of Public Works: Engineering Phone: 920-832-1581 Email: Josh.Braun@grandchutewi.gov Matt Looby, P.E. Project Engineer Ayres Phone: 920-498-1200 Email: LoobyM@Ayresassociates.com Project updates can be found here: https://www.grandchutewi.gov/departments/public- works/construction-projects/road-construction-updates/ Ingenuity, Integrity, and Intelligence.