Update on IMT-2020 Activity in ITU-R WP.5D
This document provides insights into the current status of the IMT-2020 activity within ITU-R WP.5D, including details on proposal submissions, evaluation progress, and critical milestones in the radio interface development process.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
March 2019 doc.: IEEE 802.11-19/0240r0 ITU IMT-2020 Status Date: 2019-03-14 Authors: Name Affiliations Address 2 Huntington Quadrangle 4th floor, South Wing Melville, NY 11747 Phone email Joseph LEVY InterDigital, Inc. +1.631.622.4139 jslevy@ieee.org Submission Slide 1 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 Abstract This document provides an update of the status of the IMT-2020 activity occurring in ITU-R WP 5D, as known to the author. Submission Slide 2 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 ITU IMT-2020 Status as of 11-15 February WP 5D Meeting IMT-2020 is proceeding on schedule: Proposals are due by the July 2019 ITU-R WP 5D meeting (9-17 July 2019) Therefore: contribution must be submitted by 1 July 2019 (16:00 UTC), 7 days prior to the meeting Evaluations of RITs and SRITs by Independent Evaluation Groups is on going, as well as assessment of compliance with minimum requirements, and evaluation of results by WP 5D. Currently 5 groups have submitted proposal documents to ITU-R WP 5D: 3GPP has provided a SRIT and RIT proposal documents Korea 3GPP variant has provided a RIT proposal documents China 3GPP variant has provided a RIT proposal documents ETSI and DECT Forum has provided a RIT proposal documents TSDSI (India) has provided a RIT proposal document Only one of these, 3GPP, has submitted a SRIT all of the others are RITs Note: The term RIT stands for Radio Interface Technology. The term SRIT stands for Set of RITs Submission Slide 3 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 IMT-2020 Process Schedule [1] 2017 2018 2020 2016 No.24 No.25 2019 WP 5D meetings No.36 No.23 No.26 No.27 No.28 No.29 No.30 No.31 No.32 No.33 No.34 No.35 Step1 and 2 (0) (40 months: #23 - #32) Step 3 (1) (20 months: #28 - #32) Step 4 (2) (16 months: #31 - #34) Steps 5,6 and 7 (28 months: #29 - #35) (3) Steps 8 (4) (12 months: #33 - #36) March 2019 Critical milestones in radio interface development process: (0): Issue an invitation to propose RITs March 2016 (1): ITU proposed cut off for submission of candidate RIT and SRIT proposals (2): Cut off for evaluation report to ITU (3): WP 5D decides framework and key characteristics of IMT-2020 RIT and SRIT (4): WP 5D completes development of radio interface specification Recommendations February 2020 June 2020 July 2019 - October 2020 IMT-2020 2-01 Submission Slide 4 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 IMT-2020 Process Summary [1] ITU-R Outside ITU-R Step 1 Step 2 Circular Letter to invite proposals for radio interface technologies and evaluations Development of candidate radio interface technologies Step 3 Submission/Reception of the RIT and SRIT proposals and acknowledgement of receipt Step 4 Step 5 Evaluation of candidate radio interface technologies by independent evaluation groups, grouping of the technologies through consensus building Review and coordination of outside evaluation activities Coordination between independent evaluation groups Step 6 Review to assess compliance with minimum requirements Descriptions of proposed radio interface technologies and evaluation reports Step 7 Consideration of evaluation results, consensus building, and decision Radio interface specifications (SPECS), sufficiently detailed to enable worldwide compatibility Step 8 Step 9 Development of radio interface Recommendation(s) Implementation of Recommendation(s) IMT-2020 2-02 Submission Slide 5 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 The candidate IMT-2020 radio interface(s) submitted by proponent 3GPP Meeting number Input contributions Remarks 5D/817 Part 1: SRIT submission The received materials are as follows: WP 5D#29 Initial description template (Attachment Part 1: 5D/817!P1) 5D/901 (Attachment Part 1: 5D/901!P1; Attachment Part 2: 5D/901!P2) 5D/1050 (Attachment Part 1: 5D/1050!P1; Attachment Part 3: 5D/1050!P3; Attachment Part 4: 5D/1050!P4; Attachment Part 5: 5D/1050!P5) Summary of self-evaluation calibration, including calibration parameters, methodology and results WP 5D#30 Updated characteristics template Initial link budget template Initial compliance template Preliminary self-evaluation report (3GPP TR37.910v1.0.0) No update information in this meeting WP 5D#31 WP 5D#31bis Meeting number Input contributions Remarks Part 2: RIT submission The received materials are as follows: 5D/817 WP 5D#29 Initial description template (Attachment Part 2: 5D/817!P2) 5D/901 Summary of self-evaluation calibration, including calibration parameters, methodology and results WP 5D#30 (Attachment Part 1: 5D/901!P1; Attachment Part 2: 5D/901!P2) 5D/1050 Updated characteristics template Initial link budget template Initial compliance template Preliminary self-evaluation report (3GPP TR37.910v1.0.0) No update information in this meeting (Attachment Part 2: 5D/1050!P2; Attachment Part 3: 5D/1050!P3; Attachment Part 4: 5D/1050!P4; Attachment Part 5: 5D/1050!P5) From [2] WP 5D#31 WP 5D#31bis Submission Slide 6 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 The candidate IMT-2020 radio interface(s) submitted by proponent Korea Meeting number WP 5D#29 Input contributions Remarks 5D/819 Initial description template No update information in this meeting IPR Policy compliance Updated characteristics template Initial link budget template Initial compliance template Endorsement of preliminary self- evaluation report 3GPP TR37.910v1.0.0 RIT submission The received materials are as follows: WP 5D#30 - 5D/1077 (Attachment Part 1: 5D/1077!P1; Attachment Part 2: 5D/1077!P2; Attachment Part 3: 5D/1077!P3; Attachment Part 4: 5D/1077!P4) WP 5D#31 From [3] No update information in this meeting WP 5D#31bis Submission Slide 7 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 The candidate IMT-2020 radio interface(s) submitted by proponent China Meeting number Input contributions Document 5D/838 (Attachment: Document 5D/838!P1) Remarks RIT submission The received materials are as follows: WP 5D #29 Initial description template Updated information on China development towards IMT-2020 WP 5D #30 Document 5D/986 Document 5D/1055 (Attachment Part 1: Document 5D/1055!P1 Attachment Part 2: Document 5D/1055!P2 Attachment Part 3: Document 5D/1055!P3 Attachment Part 4: Document 5D/1055!P4 Attachment Part 5: Document 5D/1055!P5) Updated characteristics template Initial link budget template Initial compliance template Preliminary self- evaluation report WP 5D #31 From [4] No update information in this meeting WP 5D#31bis Submission Slide 8 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 The candidate IMT-2020 radio interface(s) submitted by proponent ETSI and DECT Forum Meeting number RIT submission The received materials are as follows: Input contributions Remarks Initial description template Initial characteristics template and link budget template No update information in this meeting WP 5D#30 5D/978 5D/1046 WP 5D#31 (Attachment: 5D/1046!P1) WP 5D#31bis From [5] Submission Slide 9 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 The candidate IMT-2020 radio interface(s) submitted by proponent TSDSI Meeting number WP 5D #30 Input contributions Remarks RIT submission The received materials are as follows: Document 5D/980 Initial description template No update information in this meeting WP 5D #31 WP 5D #31bis Document 5D/1138 (Attachment Part 1: 5D/1138!P1; Attachment Part 2: 5D/1138!P2; Attachment Part 3: 5D/1138!P3; Attachment Part 4: 5D/1138!P4) The updated information include the updated characteristics template, initial link budget template, etc. From [6] Submission Slide 10 Joseph Levy (InterDigital)
March 2019 doc.: IEEE 802.11-19/0240r0 References 1. ITU-R R15-IMT.2020 Contribution 2 (Revision 1): Submission, evaluation process and consensus building for IMT-2020 ITU-R R15-IMT.2020 Contribution 3 (Revision 3): "Submission received for proposals of candidate radio interface technologies from proponent '3GPP' under Step 3 of the IMT-2020 process ITU-R R15-IMT.2020 Contribution 4 (Revision 3): "Submission received for proposals of candidate radio interface technologies from proponent 'Korea' under Step 3 of the IMT-2020 process ITU-R R15-IMT.2020 Contribution 5 (Revision 3): "Submission received for proposals of candidate radio interface technologies from proponent 'China' under Step 3 of the IMT-2020 process ITU-R R15-IMT.2020 Contribution 6 (Revision 2): Submission received for proposals of Candidate Radio Interface Technologies from Proponent 'ETSI' under Step 3 of the IMT-2020 process ITU-R R15-IMT.2020 Contribution 7 (Revision 2): Submission received for proposals of Candidate Radio Interface Technologies from "Proponent 'TSDSI' under Step 3 of the IMT-2020 Process ITU-R R15-IMT.2020 Contribution 1: IMT-2020 Background 2. 3. 4. 5. 6. 7. Submission Slide 11 Joseph Levy (InterDigital)