Wind-III YEKA Project: Tender Announcement, Sites, Specifications & More

yeka projects on the agenda n.w
1 / 15
Embed
Share

Explore the Wind-III YEKA project with details on the tender announcement, sites and locations, project model, procedures, and upcoming tenders. Get insights on the capacity, competition names, and how to participate in this renewable energy initiative in Turkey.

  • Wind Energy
  • Renewable Energy
  • Turkey
  • YEKA Project
  • Tender

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. YEKA PROJECTS On the Agenda invest.gov.tr

  2. YEKA PROJECTS ON THE AGENDA WIND-III YEKA PROJECT @2021 SOLAR-IV YEKA PROJECT @2022 invest.gov.tr Source: Ministry of Agriculture and Forestry

  3. TENDER ANNOUNCEMENT: 29th of May, 2021 WIND-III YEKA PROJECT Sites & Locations The projects will comprise 74 new wind power plants in 42 cities (connection zones) with a total capacity of 2000 MW. 74 10 MWe 20 MWe 30 MWe 40 MWe 50 MWe 60 MWe 70 MWe 80 MWe 90 MWe Capacity Capacities range from 10 MWe to 90 MWe. invest.gov.tr Source: Ministry of Agriculture and Forestry

  4. PROJECT MODEL: USE OF DOMESTIC PRODUCTS (YMKT) WIND-III YEKA PROJECT The Projects will be developed through allocation in exchange for Use of Domestic Products ( YMKT ) model. In the YMKT model, the YEKA usage right is assigned in exchange for a commitment to use domestic products within the renewable energy generation facilities. The awarded bidder will obtain the YEKA usage right for 49 year license period by committing to use domestically manufactured equipment and accessories. Price Guarantee The first 35 GWh of electricity generated Successful bidder will be granted a purchase and price guarantee for the first 35 GWh of electricity generated. Ceiling Price The tender will be conducted through the Dutch auction procedure upon the initial ceiling price of TRY 0,45/kWh. invest.gov.tr

  5. PROCEDURES AND NEXT STEPS WIND-III YEKA PROJECT Specifications Financial Requirements Potential bidders may purchase the Specifications by paying the purchase price to the bank account of the Ministry of Energy and Natural Resources General Directorate of Central Accountancy. 2,000 TRY: Purchase price of the Specifications 500,000 TRY: Bid bond amount for each 1 MW capacity 1 million TRY: Bid bond amount for each 1 MW capacity Tender Bidder Company Only legal persons established as joint stock companies or limited liability companies pursuant to the Turkish Code of Commerce are entitled to participate in the tender. Potential bidders will submit their applications by hand to the Ministry of Energy and Natural Resources General Directorate of Energy Affairs with a letter of bank guarantee (bid bond) The tender will be conducted through the Dutch auction procedure. The bidder who submits the lowest price will be awarded with the contest and such price will constitute the guaranteed electricity purchase price. invest.gov.tr

  6. SITES & DATE OF TENDERS WIND-III YEKA PROJECT WIND-III YEKA PROJECT 12th of October, 2021 12th of October, 2021 12th of October, 2021 CAPACITY (MWe) 50 40 50 20 70 60 50 60 20 20 20 CAPACITY (MWe) 50 60 COMPETITION NAME CAPACITY (MWe) COMPETITION NAME COMPETITION NAME Adana Ad yaman Afyonkarahisar A r - I d r Aksaray - K r ehir - Nev ehir Amasya - Samsun Ankara - K r kkale - ank r Antalya Ardahan - Kars Artvin - Rize - Trabzon Bart n - Zonguldak - Karab k Batman - Mardin - Diyarbak r - anl urfa Bayburt - G m hane - Giresun Bilecik - Eski ehir - K tahya Bing l - Tunceli Bitlis - Mu Bolu - D zce - Sakarya Burdur - Denizli - U ak Bursa Kocaeli - Yalova 40 Konya 50 orum - Kastamonu - Sinop 50 Malatya 80 Edirne Elaz Erzincan Erzurum Gaziantep - Kilis Hatay Isparta 40 40 30 30 40 40 50 Manisa 30 Ordu 50 Siirt - rnak - Hakkari 30 Sivas 90 40 60 Tekirda 40 70 30 30 40 Kahramanmara - Osmaniye 70 Tokat 60 Karaman - Mersin Kayseri - Ni de K rklareli 70 90 60 Van 30 Yozgat 50 invest.gov.tr

  7. LOCALIZATION RATIOS LOCALIZATION AND EFFICIENCY COMPONENT LOCALIZATION SCORE MINIMUM LOCAL CONTENT RATIO (%) COMPONENT SUB-COMPONENTS 1. Tower 2. Mechanical tower interior components 17 65 4 51 TOWER 3. Anchor, anchor plates, anchor chain, bolts and fasteners 1 70 1. Rotor blade 2. Rotor hub 3. Rotor blade bearings 4. Main or fixed shaft 5. Pitch system 19,5 2,3 1 2 4,5 65 51 51 51 51 ROTOR 1. Nacelle housing, spinner and canopy 2 51 2. Main frame, bed/generator frames and bed plate 3 51 3. Yaw ring 4. Yaw system 5. Main shaft bearing and main shaft bed 1 3 51 51 NACELLE 1,7 51 6. Cooling system 7. Brake system 8. Hydraulic system A.1. Gear box A.2. Generator with conventional geared 1 51 51 51 51 1,2 1,3 15 ELECTRO-MECHANICAL POWER CONVERSION SYSTEMS 5 51 B. Direct drive with synchronous / permanet magnet generator 20 51 1. Transformator 2. Power converter 3. Electronic power controller 1. Aviation beacon system 1,5 3 3 0,5 51 51 51 51 POWER SYSTEMS 2. meteorological instruments / sensors 0,5 51 3. internal nacelle crane, hoist 4. Auxialary castings and fittings 5. Lubrication system 6. Grounding / lightining system 0,5 0,5 1 0,5 51 51 51 51 OTHERS 7. Monitoring, data acquisition, control systems 3 51 8. Others 0,5 51 invest.gov.tr

  8. FORMULA PRICING MECHANISM AFGD AFGD (PP): Purchasing Price / The calculated unit electricity price (TRYcent/kWh) for a certain quarter OAFGD OAFGD (P-PP) OAFGD (P-PP): Previous Purchasing Price /The unit electricity price (TRYcent/kWh) calculated for previous quarter AFGD (PP) AFGD (PP) FEA-2: The Producer Price Index calculated for the second month before the quarter to which the updated electricity price is to apply T FE (CPI) FE (PPI) FEA-5: The Producer Price Index calculated for the fifth month before the quarter to which the updated electricity price is to apply OAFGD T FEA-2: The Consumer Price Index calculated for the second month before the quarter to which the updated electricity price is to apply T FEA-5: The Consumer Price Index calculated for the fifth month (in reverse) before the quarter to which the updated electricity price is to apply KUR D (FX Rate of USD/TRY) KUR E (FX Rate of EUR/TRY) KUR D-A : The daily average of USDTRY exchange rates, published by the CBRT, calculated for the second, third and fourth months prior to the quarter to which the electricity price is to apply KUR D-B : The daily average of USDTRY exchange rates, published by the CBRT, calculated for the fifth, sixth and seventh months prior to the quarter to which the electricity price to apply KUR E-A : The daily average of EURTRY exchange rates, published by the CBRT, calculated for the second, third and fourth months prior to the quarter to which the electricity price to apply The submitted final price in reverse-auction will be accepted as electricity purchasing price per unit for the first 15 years following the Signing of Contract. The electricity price shall be updated in all quarters (January, April, July, October) KUR E-B : The daily average of EURTRY exchange rates, published by the CBRT, calculated for the fifth, sixth and seventh months prior to the quarter to which the electricity price to apply invest.gov.tr

  9. SOME RULES of FORMULA PRICING MECHANISM ANNEX The AFGD value for any quarter cannot exceed the price cap of 6 USDcent/kwh. If the AFGD value assessed for a certain quarter is more than the price cap, which is calculated from the daily average of USD/TRY exchange rates, published by the CBRT, for the second, third and fourth months prior to that quarter to which the electricity price is to apply, the price cap of 6 USDcent/kwh will apply as AFGD in terms of Turkish Lira. invest.gov.tr

  10. TENDER ANNOUNCEMENT: 14th of July, 2021 SOLAR-IV YEKA PROJECT Solar Modules The projects will comprise 15 new solar power plants in 3 cities (connection zones) 15 Capacity Capacities stand as 50 Mwe or 100 MWe 50 MWe 100 MWe invest.gov.tr Source: Ministry of Agriculture and Forestry

  11. PROJECT MODEL: USE OF DOMESTIC PRODUCTS (YMKT) SOLAR-IV YEKA PROJECT The Projects will be developed through allocation in exchange for Use of Domestic Products ( YMKT ) model. In the YMKT model, the YEKA usage right is assigned in exchange for a commitment to use domestic products within the renewable energy generation facilities. The awarded bidder will obtain the YEKA usage right for 30 year license period by committing to use domestically manufactured equipment and accessories. Price Guarantee The first 23 GWh of electricity generated Successful bidder will be granted a purchase and price guarantee for the first 23 GWh of electricity generated. Ceiling Price The tender will be conducted through the Dutch auction procedure upon the initial ceiling price of TRY 0,4/kWh. invest.gov.tr

  12. PROCEDURES AND NEXT STEPS SOLAR-IV YEKA PROJECT Specifications Financial Requirements Potential bidders may purchase the Specifications by paying the purchase price to the bank account of the Ministry of Energy and Natural Resources General Directorate of Central Accountancy. 2,000 TRY: Purchase price of the Specifications 350,000 TRY: Bid bond amount for each 1 MW capacity 700,000TRY: Bid bond amount for each 1 MW capacity Tender Bidder Company Only legal persons established as joint stock companies or limited liability companies pursuant to the Turkish Code of Commerce are entitled to participate in the tender. Potential bidders will submit their applications by hand to the Ministry of Energy and Natural Resources General Directorate of Energy Affairs with a letter of bank guarantee (bid bond) The tender will be conducted through the Dutch auction procedure. The bidder who submits the lowest price will be awarded with the contest and such price will constitute the guaranteed electricity purchase price. invest.gov.tr

  13. SITES & DATE OF TENDERS WIND-III YEKA PROJECT SOLAR-IV YEKA PROJECT 30th of March, 2022 YEKA NAME COMPETITION NAME CAPACITY(MWe) BOR-1 BOR-2 BOR-3 ERZ N-1 ERZ N-2 V RAN EH R-1 V RAN EH R-2 V RAN EH R-3 V RAN EH R-4 V RAN EH R-5 V RAN EH R-6 V RAN EH R-7 V RAN EH R-8 V RAN EH R-9 V RAN EH R-10 100 100 100 100 100 50 50 50 50 50 50 50 50 50 50 BOR ERZ N V RAN EH R invest.gov.tr

  14. SOME RULES LOCALIZATION AND EFFICIENCY LOCALIZATION RATIOS COMPONENTS Solar Module 75% DC Solar Cable 51% Inverter 51% Carrier Construction (including solar tracking system if planned in project) 51% The solar modules must be silicon based crystal technology with at least 20% efficiency invest.gov.tr

  15. SOME RULES of FORMULA PRICING MECHANISM ANNEX The AFGD value for any quarter cannot exceed the price cap of 5.3 USDcent/kwh. If the AFGD value assessed for a certain quarter is more than the price cap, which is calculated from the daily average of USD/TRY exchange rates, published by the CBRT, for the second, third and fourth months prior to that quarter to which the electricity price is to apply, the price cap of 5.3 USDcent/kwh will apply as AFGD in terms of Turkish Lira. invest.gov.tr