This overview provides insights into the licensing process and readiness reviews for the European Spallation Source (ESS) facility, focusing on perspectives from project managers at SSM and ESS. It covers the involvement of the Swedish Radiation Safety Authority (SSM), review processes, safety analysis reports, trial operation applications, and the management structure of the licensing project core team.

  • Licensing Process
  • Readiness Reviews
  • ESS Facility
  • SSM
  • Project Management

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. ESS licensing process and Readiness Reviews Peter Frisk Project Manager SSM Johan Waldeck Licensing Project Manager ESS

  2. Presentation Outline SSM perspective of the licensing process and planned inspection program -Peter Frisk SSM ESS perspective of the licensing process and planned readiness reviews -Johan Waldeck ESS

  3. The Swedish Radiation Safety Authority (SSM) reviews of the ESS facility The SSM reviews are performed according to the EU Basic Safety Standard (EU-directive), the Swedish Radiation Protection Act, the SSM regulations and the specific SSM conditions given to ESS The SSM reviews only include safety ralated to radiation (not chemical safety, electrical safety etc.) The SSM review team consists of about 30 reviewers, a mix of engineers, PhDs, etc. from different specialities, all based at SSM. There will be no SSM site office at ESS but SSM will perform regular site inspections. The SSM reviews will be stepwise and verifications of fulfilment of SSM requirements will be performed by site inspections. The SSM site inspections will be separated from the ESS readiness reviews both in time and in content.

  4. The SSM reviews of the ESS facility The SSM document reviews will be based on the ESS safety analysis report including areas described below and a self assessments from ESS describing how they fulfil/are going to fulfil requirements given by SSM. Review areas: Organisation and Management of the Activities Protection of Workers Protection of Public and Environment Planned Emergency Preparedness Construction and Safety Analysis Mechanical Devices Physical Protection Cyber security Operation For each trial operation application ESS has to present a trial operation plan. SSM will review the plan and, thereafter, create an appropriate inspection program. ESS has to present operation limits and conditions for each trial operation application.

  5. Licensing managed as a project Core Team composed of central resources and project representatives Team meets every week Coordinate work to be performed across ESS projects Licensing not a separate thread integrated part of normal project activities Michael Per N CF Sub- project Target Sub- project Peter S Carl NSS Sub- project Q Sub- project Licensing project core team One member from each Project/division Peter Francois ESH Sub- project Systems engineerin g Johan Project manager Lali Henrik C Mikael J Acc Sub- project ICS Sub- project Admin & Proj. Man. Sub-project 5

  6. Alignment of ESS project phases to SSM licensing steps ESS project phases Preliminary Design Detailed design & Construction Procurement and Installation Commissioning Operation Trial Routine operation Permissibility Installation operation Permit Permit Permit Permit SSM stepwise licensing process 6

  7. Key events in next trial operation permits Use this time to develop evidence 7

  8. Split permit in parts to optimize overall schedule Warm LINAC SC LINAC Neutron production Trial operation permit Trial operation permit Trial operation permit 8

  9. Within a permit, split commissioning into conditional steps Warm LINAC commissioning IoS-RFQ IoS-DTL2 Commissioning IoS-DTL4 Commissioning Commissioning ESS Readiness review SSM Inspection 9

  10. Thank You!