Highlights from ACBI Group Meeting Presentations on Instrument Operations and Upgrades
Explore key updates from the ACBI group meeting presentations covering CSNS instrument operations and future improvements, including digitizer replacements, scan modes, transmission issues, BPM updates, and more for the years 2024 and 2025.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
ACBI group meeting (02/02/2024) Renjun Yang Presenter | Presentation Title
CSNS instruments operation and maintain highlights in elog LRBTCT 14 MSPS digitizer replacement (no visible improvement of DTL transmission?) LRWS new scan modes: X, Y, X+Y, X+Y+45deg (thanks to Xugong) 2024.02.21 LRBLM23 saturation due to poor tuning (not BI issue!!) RCS BPM usename/pin code update (notification in group chat?) 24.04.2025 2 Presenter | Presentation Title
transmission 24.04.2025 3 Presenter | Presentation Title
CSNS Further improvement elog / improve CSS/config but did not update to group member !!! post message in group chat ! 24.04.2025 4 Presenter | Presentation Title
CSNS-II instrumentations MEBT upgrade CT 40 mm space (z), innovation needed! Phase measurement w/ BPM latest experimental results? EM noise level reduce from 70 pC to 10 pC? High priority BSM integrated w/ trans. profile visualization SC-linac CT prototype at LRBT (2024) BPM libera single pass purchase (2024, 2025, 2026) BSM prototyping LW: prototype 2024 BLM: CFC FBLM: libera-type scintillator (ordered) 24.04.2025 5 Presenter | Presentation Title
CSNS-II instrumentations New LRBT WSM prototype (2025?) injection area upgrade CT: to be reviewed BPM: start design this month MWS: mechanical design, CNT wire experiments (urgent!!!, + beam test w/ 3 MeV beam?) SCREEN to be reviewed E-COL ? RCS BPM: Front/ board IPM: remote discussion w/ Peter + new experiments (report?); new EMI test chamber BxB FB: prepare experiments in April (R. Qiu, high priority!!) 24.04.2025 6 Presenter | Presentation Title
CSNS-II instrumentations RABT CT: new Chinese digitizer (F. Li) u-beamline MWS: ? instr.-control group collaboration any private discussion? plan B w/o control group (prepare now ) 24.04.2025 7 Presenter | Presentation Title
other project C-band photoinjector (cost reduction) New EM chamber (start modification) ICT BNCT 24.04.2025 8 Presenter | Presentation Title
others Mar 20, 2024 Student discussion report every two weeks (weekend, afternoon) no output, no further investigation (from op. budget) AoB 24.04.2025 9 Presenter | Presentation Title
2024 2 2 Hardware 6U + software FPGA AFE ADF DFE AFE/ADF DFE + hardware FPGA software 24.04.2025 10 Presenter | Presentation Title