ICCP Telemetry Points Modeling and Market Trial Handbooks Update

technical working group twg n.w
1 / 5
Embed
Share

Explore the latest updates on RTC+B ICCP telemetry points modeling, including changes in ESR device names and requirements for modeling new points. Also, learn about the QSE Telemetry Check-Out handbook in the Market Trial Handbooks series. Stay informed on the evolving standards in the power sector.

  • ICCP Telemetry
  • Modeling Update
  • Market Trial Handbooks
  • RTC+B
  • Power Sector

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Technical Working Group (TWG) RTC+B ICCP Telemetry Points Modeling Tejaswi Potluri Kevin McGarrahan 01/30/2025

  2. RTC+B ICCP Telemetry Points Modeling RTC+B ICCP Telemetry Model changes o QSEs to Submit new ICCP telemetry point requests o QSEs/ERCOT to maintain the new ICCP telemetry points for both current system and RTC+B system through weekly model loads. 2 2 Public

  3. RTC+B ICCP Telemetry Points Modeling In RTC+B, single model ESR device names are changed to ESR1, ESR2,..,ESR# under a given site. o All current Combo Model ESR GN telemetry points that are not marked for deletion after RTC+B go live along with the new RTC+B telemetry points are required to be modeled under Single Model ESR device. o Station specific ICCP telemetry like line flows, auxiliary load are NOT required to be modeled again. o ERCOT will publish new Single Model ESR names for existing combo-model ESRs and communicate through a Market Notice. o Non-ESR Generation Resources as well as Controllable and Non-Controllable Load Resources are required to model the new RTC+B telemetry points under the existing non-ESR device. o 3 3 Public

  4. RTC+B ICCP Telemetry Points Modeling All ICCP points mentioned in the handbook for a given resource type are expected to be modeled irrespective of participation in the A/S market. o A resource type specific ICCP modeling template will be published to ercot.com. o RTC+B ICCP Handbook was updated to clarify RTC+B specific telemetry points (example: RSTR, PFRA etc.) o *Link to RTC+B ERCOT Nodal ICCP Communications Handbook 4 4 Public

  5. Market Trial Handbooks - QSE Telemetry Check-Out (Handbook #2) 5 Public

More Related Content