
IEEE 802.11 Next Generation Positioning Closing Report May 2021
Read the latest updates on the IEEE 802.11 Next Generation Positioning project from the May 2021 electronic meeting. Explore progress made, targets set for the upcoming months, and the timeline of events leading to the July meeting. Stay informed about the scheduled teleconferences and key milestones achieved. Authored by Jonathan Segev of Intel Corporation.
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
May 2021 doc.: IEEE 802.11-21/487r0 TGaz Next Generation Positioning May Electronic Meeting Closing Report Date: 2021-05-17 Authors: Name Jonathan Segev Intel Corporation 2200 Mission college blvd. Santa Clara +1-408-203-3337 Affiliations Address Phone email jonathan.segev@intel.com Submission Slide 1 Jonathan Segev, Intel corporation
May 2021 doc.: IEEE 802.11-21/487r0 Abstract This document is the TGaz Next Generation Positioning closing report for the IEEE 802.11 interim electronic meeting, May 2021. Submission Slide 2 Jonathan Segev, Intel corporation
May 2021 doc.: IEEE 802.11-21/487r0 May Progress and Targets Towards the July Meeting Work completed: Reviewed/approved resolution to 36 CIDs. Targets toward July: Complete LB253 comment resolution. Generate P802.11az D3.1 adopting resolutions from March and May meetings. Respond to MDR findings (Editors). Submission Slide 3 Jonathan Segev, Intel corporation
May 2021 doc.: IEEE 802.11-21/487r0 Timeline updated past May meeting 2018 2019 2017 2020 2021 2022 2023 SFD Final .11az requirement freeze 5-2017 Initial WG ballot July 18 Inter. comment collection .11az D0.1 Mar. 18 .11az Draft 2.0 11-2019 Recirculation 2nd SA comp. 1st SA comp. .11az Draft 4.0 07-2021 Recirculation D1.0 Jan. 19 .11az Draft 3.0 01-2021 Recirculation Publication No changes made, in preparation to SA ballot .11az MDR and SA ballots 07-2021 MDR 11az SFD Clean Next LB 5/17-3/21 LB240 CR LB249 LB253 Amendment text 2nd SA 1st SA CC28 SFD Freeze Initial WG ballot LB240 Pass LB240 completion/ recirc. init LB249 completion/ 2nd recirculation Submission Slide 4 Jonathan Segev, Intel corporation
May 2021 doc.: IEEE 802.11-21/487r0 LB253 Completion Status Submission Slide 5 Jonathan Segev, Intel corporation
May 2021 doc.: IEEE 802.11-21/487r0 Scheduled telecons May 26* June 2, 9, 16, 23, 30 June 24 + July 7 Wed. 13:00 15:00 ET Wed. 13:00 15:00 ET Thur. 10:00 12:00 ET Wed. 13:00 15:00 ET *Previously announced. **WG May meeting is running July 11th 16th , refer to WG agenda doc. + TGaz Plenary (motion) meeting. Submission Slide 6 Jonathan Segev, Intel corporation