Impacts of Intra-Hour Energy Offer Curve Submissions on SCED Performance

potential impacts of intra hour energy offer n.w
1 / 5
Embed
Share

Explore the potential impacts of intra-hour energy offer curve submissions on SCED performance in ERCOT. Understand how SCED data reads work today, with changes in real-time and average run times. Learn about cautionary notes regarding the implementation of intra-hour EOCs for storage resources.

  • Energy
  • ERCOT
  • SCED
  • Performance
  • Mitigation

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Potential Impacts of Intra-Hour Energy Offer Curve Submissions on SCED Performance ERCOT Staff WMWG August 19, 2019

  2. SCED data reads: How it works today Some data is static for the full Operating Day Example: Resource parameters Some data changes by the hour Energy Offer Curves Mitigated Offer Cap Curves & Offer Floor 2 PUBLIC

  3. SCED data reads: How it works today Some data changes in real time, with every SCED run. For example: Resource status MW LDL/HDL Transmission constraints Normally: SCED run at top of HE 01 takes the longest SCED run at top of each hour is second-longest Intra-hour SCED runs are the fastest 3 PUBLIC

  4. 2019 SCED timestamps Jan. 1 thru July 10, 2019 SCED average run times : SCED Type No. of runs Mean (seconds) 1st of Day 191 18.3 1st of Hour 4,751 16.0 Others 54,534 12.2 This data indicates that intra-hour SCED runs that include reads of new EOCs should increase run time by less than 4 seconds, on average ERCOT cautions that this is only an estimate; results after actual implementation could vary 4 PUBLIC

  5. Cautionary notes Intra-hour EOCs for storage resources should not be implemented without first developing mitigation rules for storage There will be system impacts, magnitude currently unknown: Settlements Market Management System MIS Reports Others . 5 PUBLIC

More Related Content