NDCRC.RTC+B Updates and Changes Overview

ndcrc rtc b changes n.w
1 / 10
Embed
Share

Discover the latest updates and changes in NDCRC.RTC+B, including timeline adjustments, reactive test modifications, AVR test enhancements, unit database changes, and more. Stay informed about the upcoming release and project progress in December 2025.

  • NDCRC
  • RTC+B
  • Updates
  • Changes
  • Database

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. NDCRC RTC+B Changes Nick Barbas April 24, 2025

  2. NDCRC RTC+B Timeline Update o NDCRC RTC+B release planned for production in December 2025 to incorporate changes supporting the submission of test data for single model ESRs o Project is in execution phase with a release candidate currently deployed to test environment at ERCOT 2 PUBLIC

  3. NDCRC RTC+B Reactive Test Changes o Launching a new ESR specific version of the reactive test that s similar to existing MVAR/IRR versions of the form with the following notable changes o Only allows selection of single model ESR units o Displays two separate sets of CURL points for discharging and charging rather than a single set like existing reactive tests o CURL Points (Charge) section expects negative Megawatt values o The 3 separate tests to gather metrics on are now classified as Test 1a (15 min) , Test 1b (15 min) , and Lagging Test 2 (1 hr) o VSS Validation section of form adds Max Net Discharge Power and Max Net Charge Power fields 3 PUBLIC

  4. NDCRC RTC+B 4 PUBLIC

  5. NDCRC RTC+B 5 PUBLIC

  6. NDCRC RTC+B 6 PUBLIC

  7. NDCRC RTC+B AVR Test Changes o Users are expected to use the existing version of the form to submit single model AVR tests, unlike the reactive test o New field added to form called AVR Test Category with values ESRCharging , ESR Discharging , and Normal 7 PUBLIC

  8. NDCRC RTC+B 8 PUBLIC

  9. NDCRC RTC+B Unit Changes - Database o Units with the designation PWRSTR (power storage) representing the generation side of a combo model ESR will be removed o Units with the designation CLR (controllable load resource) representing the load side of a combo model ESR will be removed, but other CLRs outside of combo model ESRs will remain in the database o New units with the designation ESR (energy storage resource) will be added to the database to replace the removed PWRSTR / CLR combo model units o Naming convention for ESR units are STATION_ESR1 , STATION_ESR2 9 PUBLIC

  10. NDCRC RTC+B Unit Changes Existing NDCRC Forms o CT Freq. Resp. exclude single model ESRs from unit list o ESR Freq. Resp. only show single model ESRs in unit list o CLR Freq. Resp. only show CLRs that aren t part of a combo model ESR o Turbine Mech-Hydr. exclude single model ESRs from unit list o Turbine Electro-Hydr. exclude single model ESRs from unit list o Historical Freq. Resp. exclude single model ESRs from unit list o ESR Historical Freq. Resp. only show single model ESRs in unit list o Unannounced Seasonal HSL exclude single model ESRs from unit list 10 PUBLIC