Public Meeting for Intersection Improvements at Walton Ferry Rd. & Old Shackle Island Rd.

design public meeting n.w
1 / 8
Embed
Share

Join the public meeting discussing the realignment of Walton Ferry Rd. & Old Shackle Island Rd. with West Main Street to improve traffic flow, access to businesses, and safety for pedestrians and cyclists in Hendersonville, Sumner County. Learn about the project details, timeline, and have your questions answered by representatives.

  • Public Meeting
  • Intersection Improvements
  • Hendersonville
  • Sumner County
  • Traffic Flow

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. DESIGN PUBLIC MEETING WALTON FERRY RD./OLD SHACKLE ISLAND RD. WALTON FERRY RD./OLD SHACKLE ISLAND RD. FROM IMPERIAL BLVD. TO VOLUNTEER DRIVE FROM IMPERIAL BLVD. TO VOLUNTEER DRIVE HENDERSONVILLE HENDERSONVILLE SUMNER COUNTY SUMNER COUNTY PROJECT NO. PROJECT NO. STP STP- -M M- -9307(12) 9307(12) April 18, 2011 April 18, 2011 5:00 p.m. to 7:00 p.m. 5:00 p.m. to 7:00 p.m.

  2. WELCOME & THANK YOU FOR ATTENDING INTRODUCTION OF TDOT REPRESENTATIVES AND DESIGN CONSULTANTS DESCRIPTION OF THE PROJECT LOCATION OF DISPLAYS AND ACQUISITION TABLES KEY POINTS TO REMEMBER AND MAKING STATEMENTS TO THE COURT REPORTER GENERAL QUESTIONS ABOUT THE PROJECT

  3. PURPOSE OF PROJECT REALIGN THE INTERSECTION OF WALTON FERRY ROAD AND OLD SHACKLE ISLAND ROAD WITH WEST MAIN STREET (SR-6). IMPROVE ACCESS TO BUSINESSES THAT ARE AFFECTED BY THE EXISTING GEOMETRY DURING PEAK TRAFFIC HOURS. CREATE SAFE, EFFICIENT MOVEMENT AND ACCESS ALONG THE PROPOSED ROUTE. IMPROVE TRAFFIC FLOW AND REDUCE DELAY. PROVIDE SAFE ACCESS FOR BICYCLISTS & PEDESTRIANS.

  4. PROJECT LOCATION, LENGTH & IMPROVEMENTS BEGINS AT IMPERIAL BOULEVARD AND ENDS AT VOLUNTEER DRIVE. APPROXIMATE LENGTH OF PROJECT IS 0.74 MILES DESIGN REQUIRES A MINIMUM R.O.W. OF 68 . WILL ALSO UTILIZE SLOPE, CONSTRUCTION AND PERMANENT DRAINAGE EASEMENTS.

  5. TYPICAL SECTION

  6. INTERSECTION IMPROVEMENTS AT W. MAIN STREET. REALIGN THE INTERSECTION OF WALTON FERRY ROAD AND OLD SHACKLE ISLAND ROAD WITH WEST MAIN STREET (SR-6). IMPROVE INTERSECTION OPERATION, EFFICIENCY AND CAPACITY. PRESENT LAYOUT PROPOSED LAYOUT

  7. PROJECT TIMELINE (PRELIMINARY) SUBJECT TO FUNDING AVAILABILITY APRIL 2011 SPRING 2012 2012 2013 2013 DESIGN PUBLIC MEETING RIGHT OF WAY PLANS PURCHASE RIGHT OF WAY CONSTRUCTION PLANS AWARD CONSTRUCTION CONTRACT

  8. QUESTIONS & COMMENTS OPTIONS FOR PUBLIC COMMENTS WALL DISPLAYS & PRELIMINARY PLAN SETS TDOT REPRESENTATIVES FROM DESIGN AND RIGHT OF WAY & TDOT DESIGN CONSULTANT REPRESENTATIVES WILL BE AVAILABLE FOR THE DURATION OF THE MEETING GENERAL QUESTIONS OR COMMENTS