Explore the collaborative project on constructing a power converter for wind turbines led by a group of students and their mentor, aiming to enhance wind energy conversion systems. Check out images, layouts, work breakdown structures, and the current status of the project.

  • Wind Power
  • Converter
  • Group Project
  • Wind Turbines
  • Renewable Energy

Uploaded on | 1 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. Wind Power Converter Group Members: Mohammad Alenezi, Fahad Alazemi, Hamad Abdulmalek, Abdullah Alghasab Client: Dr. Yaramasu Mentor: Ashwija Korenda 1

  2. Introduction What is Wind Turbine? Our goal in this project is to build a power converter that used in Wind Turbine. NPC (Neutral Point Clamped) converter. [1] Type 4 : WECS 2 Abdullah Alghasab

  3. Layout 3 Mohammad Alenezi

  4. Mohammads WBS 4 Mohammad Alenezi

  5. Fahads WBS 5 Fahad Alazemi

  6. Abdullahs WBS 6 Abdullah Alghasab

  7. Hamads WBS 7 Hamad Abdulmalek

  8. Conclusion Current Status: Subsystem 1 Subsystem 3 In Progress Subsystem 2 Final Design 8 Hamad Abdulmalek

  9. Reference [1] Y. Venkata & W. Bin. BASICS OF WIND ENERGY CONVERSION SYSTEMS (WECS) . 9

  10. Questions? 10