
Campus Electrical Distribution Upgrade Project Details
"Explore RFP 17-317-1A VHR Campus Electrical Distribution Upgrade Phase 1A. Learn about the solicitation process, key dates, and procurement phases involved. Find all necessary documents and contact information for inquiries."
Download Presentation

Please find below an Image/Link to download the presentation.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.
You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.
The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.
E N D
Presentation Transcript
RFP 17-317-1A VHR Campus Electrical Distribution Phase 1A Preproposal Meeting August 4, 2020 10:00AM
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Objective of the Solicitation is to select a qualified Utility Site Contractor who will also act as the General Contractor for Phase 1A of the UMB Campus Electrical Distribution Upgrade project. Work is being done under a developer s agreement between UMB and the City of Baltimore. Solicitation prepared by UMB Construction and Facilities Procurement of the Office of Strategic Sourcing and Acquisition Services Specifications and Design done by RMF Engineering, Inc.
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Solicitation documents, including any addenda, are posted on UMB s electronic bid board at: https://www.umaryland.edu/procurement/ebid-board/ Issuing Office is sole contact for any questions related to the procurement Valerie Rolandelli vrolandelli@umaryland.edu Michael Lacey mlacey@umaryland.edu
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Summary of Solicitation - Responsibility of Proposers to familiarize themselves with the Solicitation and its requirements Table of Contents Solicitation Schedule RFP Sections 00100-00400 Section 00700 General Terms and Conditions issued as separate document Section 00800 Amendments to the General Terms and Conditions (related to Baltimore City) Section 00830 Prevailing Wage Rates Attachments Specifications and Drawings
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Solicitation Schedule Important Dates Monday, August 10, 2020 Questions Due Thursday, August 20, 2020 on or before 8:00 PM Technical Proposals only due: submitted electronically refer to Section 00100 Paragraph E for email address for this submittal
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Section 00100: This is a phased procurement: Technical Proposal Initial Technical Evaluation resulting in shortlist Oral Presentation/Discussions with shortlisted Proposers Second Phase Technical Evaluation resulting in final shortlist Price Proposal from final shortlisted Proposers
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Minority Business Enterprise Goals/Subgoals: 15% of Total Contract Dollar Amount 7% for African American MBE s 4% for Asian American MBE s Refer to Section 00700 Paragraph 9.05 and Attachment H for detailed instructions and forms regarding the MBE Program and Requirements.
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A eBuilder Project Management Software Attachment I Procurement Terms and Conditions
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Section 00200 List of Contract Documents Attachment C Construction Contract and Forms
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Section 00300 Procurement Process Article 1 Technical Proposal Requirements Article 2 Initial Evaluation of Technical Proposals Article 3 Oral Presentation/Interview Sessions Article 4 Price Proposal
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Technical Proposal Criteria (listed in order of importance) Forms are in Attachment A issued as separate WORD file Proposer s Key Personnel- Complete Key Personnel Form for Project Manager and Field Superintendent PM must have 5 years minimum experience as PM FS must have 5 years minimum experience as FS; must be 100% on site once construction commencements Personnel Commitment: No personnel changes are permitted without written authorization by UMB
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Firm Experience Complete Firm Experience Form for 3 similar/relevant projects Must be completed within 10 years 2 of 3 must be duct banks/similar site work 1 of 3 must be urban (preferably Baltimore) 2 of 3 must be substantially complete (3rdmay be in construction but at least 50% complete) Projects should be greater than $1M
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A References: Provide accurate, complete information for references (preferably owners) both the Key Personnel and the Firm Provide name of person at owner (or GC) who can speak to the performance of the Proposer in detail Phone numbers should include extension and/or voicemail prompts Email address should be provided so UMB can schedule reference calls References are to be provided in the Technical Proposal, however, UMB intends to contact references during the second phase of the procurement UMB may check any references including those not identified by the Proposer as well as use past performance with UMB.
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Project Approach/Preliminary Schedule Provide narrative that identifies project specific challenges and proposed approach to address them Identify past projects with similar challenges Identify long lead equipment and material items Provide preliminary schedule (Bar Chart or Gantt Chart) that identifies project critical path
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Profile of Proposer Complete Profile form Annual Construction Volume/Number of Projects part of Profile form Current Workload form
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Forms: -Bid/Proposal Affidavit -Acknowledgement of Receipt of Addenda -MBE Utilization and Fair Solicitation Affidavit H-1A, Part 2 - By law, failure to include this form is NONCURABLE. -eBuilder Affidavit
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Article 2 Initial Evaluation Evaluated as to: Experience of Key Personnel and Firm that demonstrates similar projects in term of size, scope, urban setting, and complexity Clear understanding of UMB s project, schedule, and challenges Profile, construction volume, current workload that demonstrates sufficient resources available Will result in shortlist of best technically qualified proposers Only shortlist will advance to the next phase
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Oral Presentation (Interviews) -Thursday, September 3, via WebEx -Proposed Project Manager and Field Superintendent (Set aside entire day on calendar) -Purpose: Meet PM and FS Discuss Technical Proposal, in particular Proposed Schedule and Project Challenges Clarify Scope
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Second Phase Technical Evaluation Based on Oral Presentations (Interviews) and Technical Proposal All criteria will be re-evaluated References will be incorporated for both Key Personnel and Firm Same order of importance Second shortlist results Final Shortlist will be ranked
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Price Proposal Only final shortlist will submit a Price Proposal Lump sum for base scope, however, may request break out, itemization of the lump sum No alternates are anticipated UMB may request unit prices to be utilized for change orders, if any Prevailing Wage Rates are applicable (Section 00830) Price Proposal form, Bid Bond (5%), and Apprenticeship Training Fund Verification Affidavit will be issued by addendum.
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Final Evaluation: Technical merit weighs greater Final ranking based on the second technical evaluation and price proposal evaluation UMB will choose from amongst the highest rated proposals that which will serve its best interest. UMB may negotiate or modify any element of the proposal evaluation process. UMB may award with or without negotiations
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Section 00400 Scope of Work Utility Contractor will also be the General Contractor Ten (10) months from NTP to Substantial Completion with an additional three (3) months for closeout Add Alternate Work is no longer part of the solicitation
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A Section 00700 UMB s General Terms and Construction for Construction dated July 2020 (recently updated) Section 00800 UMB s General T&C s supplemented by two requirements related to the City of Baltimore Section 00830 Prevailing Wage Rates
RFP 17-317 1A VHR Campus Electrical Distribution Upgrade Phase 1 A QUESTIONS????