Effective Strategies for Document Management and Collaboration in Construction Projects

projectwise and sitemanager n.w
1 / 19
Embed
Share

Enhance project efficiency with essential tips for document management and collaboration in construction projects. Learn about ProjectWise, proper naming conventions, and important tasks in SiteManager. Stay ahead with the latest tools and best practices.

  • Construction
  • Document Management
  • Collaboration
  • ProjectWise
  • SiteManager

Uploaded on | 0 Views


Download Presentation

Please find below an Image/Link to download the presentation.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author. If you encounter any issues during the download, it is possible that the publisher has removed the file from their server.

You are allowed to download the files provided on this website for personal or commercial use, subject to the condition that they are used lawfully. All files are the property of their respective owners.

The content on the website is provided AS IS for your information and personal use only. It may not be sold, licensed, or shared on other websites without obtaining consent from the author.

E N D

Presentation Transcript


  1. ProjectWise and Sitemanager Matt Looney, PE KYTC Construction Matt.Looney@ky.gov (Yes, I know these are very dry topics)

  2. -New Template as of December 2013 -77 folders down to 34 folders -All Construction Personnel can Add/Delete/Rename folders as they see fit. (But please use similar folder names and locations if adding/renaming folders)

  3. -New Guidance Documents in ProjectWise -KYTC-Main\Documents\Central Office\Construction\ProjectWise Info\Folder Structure and Guidance -Also included as hard copy in New SE Reference Guides (available at this meeting!)

  4. -Proper Naming is Critical -Be sure to always name documents so they can be identified by name without a user having to open the document. -Always include: -Contract ID -Type of Document (Final Inspection, Formal Acceptance, Completion Notice, etc.) -Date of Document if Applicable

  5. -File Name Examples 121302FinalInspectionReport.pdf 121302Formal AcceptanceReport.pdf 121302Pier2damage20130902.jpg

  6. SiteManager

  7. Still Important to do 1.Enter Key Dates in a timely manner 2.Send Reports Generated in SiteManager. - Work Complete Notice - Corrective Work Complete Notice

  8. SiteManager 3.10a Soon to be a thing of the Past!! (maybe)

  9. SiteManager 3.13a HELLO FUTURE!!

  10. SiteManager 3.13a Not too much has changed for the user from version 3.10a. - Change Order Screens now have tab navigation

  11. .And then what?

  12. Currently beginning Beta testing phases for: -Sitemanager 3.15a -And then .

  13. AASHTOWare Project 3.0 Web based system extension of PreConstruction program already in use by KYTC. 2016?

  14. QUESTIONS? -I can t make your local network connection faster. -I can t get you cell phone service that works. -I can t get you better trucks, more people, or increments. - Anything else is fair game.

  15. Contact Info: Matt.Looney@ky.gov (502) 564-4780 Office